| < Back to Conzeta Properties | New Properties | Home Page | Resale Properties | Contact Info |  

   • Residencial Verdales Apartments    • Residencial Verdales Villas    • Vinas Del Sol     • Residencial Azucena     • Residencial Calvari

 

SPECIFICATION OF RESIDENCIAL VERDALES APARTMENTS

 

| < Back to Residencial Verdales main page |

BUILDING SPECIFICATIONS (602/19-05-06)

1.- EARTH MOVEMENTS

All works of earth movements- clearing, cleaning, fillings, cutting and will be executed by manual and mechanical means .

The trench foundation will be homogeneous in order to get the depth and width measurements which will determine the calculation of the structure

2.-FOUNDATION

The foundation of the basement will be executed by earth bearing walls, unsymmetrical footing and and bridging joist of reinforced concrete, on a previous layer of cleaning concrete, the fencing and the sealabilities will be executed by unsymmetrical footing.

3.-STRUCTURE

The structure will be done by one-way forging of reinforced concrete for horizontal elements and mixed for vertical elements.

4.- WALLING

Front sealings

The sealability of the apartments will be executed by ceramic brick of 33x16x11 cm. and folded with sheet of 33x16x7 cm., plugged with concrete, union of 1 cm. thickness, insulation based on proyected polyurethane foam. Exterior coated with mortar unilayer and subsequently painted, colour will be decided by the company’s engineers.

Interior Distribution

For the interior partitions it will be used ordinary air bricks of 33x16x7 cm thickness, for plaster coating.

For the sealability of the dividing walls, it will be used double sheet of ordinary air bricks of 33x16x11 cm. and insulation based on rock wool panels.

For the formation of terrace ledges it will be used ordinary concrete bricks of 33x16x11 cm.

5.- ROOFING.

It will be executed by inclined and flat roofs, forged with waterproofing, thermal insulation and with Arabic-style tiles mixed or aging where appropriate, on the inclined ones and of “rasilla” on the flat ones, according to the regulations currently in force.

6. WATERPROOFING AND INSULATIONS.

The air chambers of the main front will be projected by expanded polystyrene foam.

The part of the basement walls stays below the land level, it would be made in waterproof and protected from the contact with the plot.

7.-CARPENTRY.

Interior Carpentry.

The interior woodwork will be of natural wooden or beech tree, varnished in clear/natural colour or lacquered in white, models of Arguti or similars, provided with iron fittings, brass pin hinges and sealing gum.

Exterior Carpentry.

The exterior woodwork will be of PVC or aluminium lacquered in white, slided or reclined with double glass, bedrooms will be equipped with alumimium roller blinds.

The railings will be of galvanized steel, ended in colours.

8.-COATINGS AND PAINTWORK.

Tiled Floor and Tiling.

The flooring,skirting board and tiling will be of excellent stoneware layed with concrete cement 1:6 ; or with bonding cement on mortar guide line in case of the tilings.

The main access, and the settlements of the common elements will be of concrete marble.

At the kitchens, bathrooms and washrooms, the solution of the tiling does not contain border pieces. It will be executed up to the ceiling and concluded with molding plaster.

Constants Coating.

Such as we described, the exterior coating will be rough-coated and painted and will be of unilayer mortar at the wall section, the colour will be decided by the Professional Heading.

At the interior, the coating will consisted in plasterwork of gypsum with a good eyesight and the corner brackets of PVC.

At the basement floor, plastered with trowel and filled with gypsum mortar.

Plaster plates wherever itīs necessary, and also in bathrooms, toilets and distributors.

Paintwork.

The interior walls will be painted with washable plastic paint on ceilings and walls, in light shades.

The wood pieces will received two coats of varnish over a treated woodwarm preparation base.

The metal surfaces will received a painting of enamel over a rust preventative base.

At the basements painting in two shades, colours decided by the Professional Heading.

9.-BATHROOMS FITTINGS AND PLUMBING INSTALLATION.

Plumbing.

The plumbing installation for warm and cold water will be made with copper, electrolytic or polipropylene piping, according with rules.

Drainages.

The sanitation facilities dispose of a trap; the drainpipes will be of PVC and they will ended up straight to the municipal supply system.

Bathroom Fittings.

The bathroom will be composed of white sanitary units, model Dama from Roca or similar. All mixer taps of chromium-plated. The bathrooms will be made up of the following accessories: mirror, small brush, two towell-rails (bar and ring), roll holder, soapdish.

10.- HEATING AND AIR-CONDITIONING.

At each accommodation, pre-instalment of air-conditioning by heat pump with cold and warm system.

Equipped with a thermoelectric of 100 l. to produce sanitary hot water.

11.- ELECTRIC,TELEPHONY AND T.V. INSTALLATION.

These installations are equipped with independent circuits in accordance with the appropriate degree of the housing, always depending with the prevailing rules. Three television and urban phone supplies connections per house. The T.V. installation system will be digital channel and per cable.

The electric mechanism, determined under the Professional Direction.

12.- OTHER INSTALLATIONS.

Kitchen furnitures, ups and downs standard heights, lacquered or finished with wood, models from Arguti or similar, concrete granite banks of 2 cm. thickness with double border all along his front.

Disposed of the following equipament:

- Instalment of telescopic extractor hood.

- Glass-ceramic hob and white or black oven.

- A single stainless sink with drainboard.

- Mixer taps of chromium-plated.

- Pre-installation of the washing machine and dishwasher.

Entry phone with a interior set, situated at the hall or kitchen.

Mailbox and signposting of the house.

In adherence to the terms stipulated in the agreement of C.P.I.-96 for housing and basement destined to car park.

The housings have to be handed completed clean of construction materials and rubbles.

Otherwise, if the construction parts of this memory doesnīt agree with the plans,it would prevail the pieces and details of the plans.

By requirement administrative, juridical, technical, manufacturing and regulations, the Property Developer hold all rights reserved (authorized by the buyer) to introduce any changes, unanimously with the Professional Management.

 

 

| < Back to Residencial Verdales main page |